Pending plans
Change to the Pukkilanluoto and Haaronluoto waterfront town plan , initiation and draft plan 8/26/2021
Lanskeri beach township plan change , initiation and draft plan 20, 2021
Finholm beach town plan , draft and initiation on 14.1.2021
Change to Kluuskeri’s waterfront layout , draft and initiation January 13, 2021
You can find the materials from this link, which is directed to Nosto Consulting Oy’s website.
Nimi | Nimike | Puh | Sähköposti | Soittoajat | Kuvaus |
---|---|---|---|---|---|
Jussi Lehto | Building Inspector | 050 0740 006 | jussi.lehto@kustavi.fi | Phone hours Mon 12: 00-15: 00 and Wed 12: 00-15: 00. |